AXIS GRID SYSTEMS
aT AXIS GRID SYSTEMS, WE BRING COMPLETE GRID INDEPENCY TO COMPANIES WHOSE REVENUE RELIES ON GRID RELIABILITY. WITH A MICROGRID, YOU CAN CONTINUE FORWARD KNOWING THAT YOU ARE PROTECTED.
INDEPENDENCE, ENGINEERED.
■
■
AXIS GRID SYSTEMS ENSURES THAT YOU CAN OPERATE SAFELY, EFFECIENTLY AND WITHOUT INTERUPTION IN THE EVENT OF A GRID FAILURE. WHETHER ITS AN ASSESSMENT OF AN EXISTING MICROGRID OR A COMPLETELY NEW INTEGRATION, WE PRODUCE THE RESULTS YOU NEED TO MOVE FORWARD.
01
PROCESS
■ ASSESSMENTS
OUR IN-DEPTH FIELD ASSESSMENTS INCLUDE A SURVEY OF EXISTING OR PRELIMINARY BACK-UP POWER GENERATION, ELECTRICAL DISTRIBUTION, ATS POINTS, TOTAL AND CRITICAL FACILITY LOAD, FACILITY INFRASTRUCTURE AND MORE TO ENSURE A RELIABLE AND QUESTION-FREE MICROGRID. MOST OF OUR TARGET FACILITIES INCLUDING COLD STORAGE, DATA CENTERS AND HOSPITALS HAVE EXISTING MICROGRIDS - OUR ASSESSMENTS PROVIDE AN ENGINEERED AND RELIABILITY DRIVEN ANSWER TO WHETHER OR NOT THAT SYSTEM CAN HANDLE THE LOAD YOU NEED TO CONTINUE RUNNING.
ASSESS. ANALYZE. PLAN. EXECUTE.
AN INFORMATION REQUEST IS APPLIED BEFORE A FIELD ASSESSMENT TO ENSURE AN ACCURATE AND RELIABLE ASSESSMENT AND POST-REPORT. INFORMATION REQUESTED INCLUDES UTILITY BILL DATA, ONE-LINE DOCUMENTS, AVAILABLE RUN TIME BEFORE REVENUE LOSS, CRITICAL LOAD DOCUMENTATION, EXISTING GENSETS AND MORE.
02
■ ANALYZE
OUR TEAM ANAZLYZES COLLECTED DATA AND MODELS FACILITY CRITICAL LOADS, START TIMES, SEQUENCING, RUN TIMES AND POTENTIAL EXISTING FAILURE POINTS. WE DON’T SELL EQUIPMENT, WE SELL FORESIGHT INTO YOUR MICROGRIDS CAPABILTIES.
ADDITIONAL INFORMATION MAY BE REQUESTED AFTER ASSESSMENT BASED ON FACILTIY OPERATIONS, STATE OR COUNTY REGULATORY FACTORS AND MORE. THIS IS TO ENSURE AN ACCURATE AND RELIABLE MODEL.
03
■ PLAN
AFTER MODELING IS COMPLETE, WE BEGIN THE REPORT DELIVERABLE. THIS INCLUDES ANY FINDINGS WE HAVE FOUND IN WAY OF OPTIONS LISTED WITH UPGRADE OPTIONS OR CONFIRMATION THAT YOUR SYSTEM IS OPTIMAL - UPGRADE OPTIONS INCLUDE BASIC EXISTING SYSTEM HARDENING TO NEW SYSTEM DESIGN.
POST-ASSESSMENT REPORTS ARE TYPICALLY SURROUNDED AROUND AN IN-PERSON MEETING IN ORDER TO ACCURATLY CONVEY FINDINGS, RECOMMENDATIONS AND CREATE DISCOURSE AROUND ANY QUESTIONS OR CONCERNS.
04
■ EXECUTE
aFTER AN OPTION IS AGREED UPON, OUR TEAM BEGINS THE EXECUTION OF THE PATH FORWARD. WE MANAGE ALL ASPECTS OF UPGRADES INCLUDING THE DESIGN, ENGINEERING, INTEGRATION AND COMMISSIONING OF A NEW MICRO-GRID SYSTEM.
COMMUNICATION IS KEY THROUGHOUT THE EXECUTION PROCESS WHETHER THERE IS A FULL UPGRADE TO COMMENCE OR NO ACTION TAKEN AT ALL, WE VALUE OUR CLIENT RELATIONSHIPS AND CAN ALSO PERFORM ROUTINE MAINTENANCE, TESTING, FUEL LOGISTICS AND MORE.
about us
■ OUR STORY
aXIS GRID SYSTEMS WAS CREATED IN ORDER TO BUILD. AFTER A CAREER AROUND MULTIPLE ENGINEERING DISCIPLINES, i HAVE GROWN A LOVE OF FINDING A PROBLEM AND SOLVING IT. WITH EVER GROWING GRID DEMANDS AND THE LACK OF ABILITY FOR UTILITY COMPANIES TO KEEP UP, I FOUNDED AXIS GRID SYSTEMS TO BRIDGE THE GAP BETWEEN A COMPANY AND POWER INDEPENDENCE. MICRO-GRIDS ARE WHAT WILL ALLOW THE INFLUX OF CRITICAL INFRASTRUCTURE TO OPERATE WITHOUT FEAR OF REVENUE-LOSS DUE TO GRID FAILURE AND WE ARE HERE TO DELIVER.
CONNOR SHANNON, FOUNDER
LETS GET STARTED
■
■
CONTACT AXIS GRID SYSTEMS TO LEARN MORE ABOUT OUR PROCESS AND HOW WE CAN HELP.